Wilson Dock
Westwood Curtis Construction completed construction of a private dock and waterfront improvements in Wilson, Wyoming.
Project highlights include:
Installation of steel H-piles using hydraulic crane
Construction of metal dock frame with decking and handrails
Imported beach sand from Eagle, Idaho
Installation of underground freshwater supply
This project required specialized equipment and careful coordination in a waterfront environment.
West Broadway Landslide
Westwood Curtis Construction served as Construction Manager at Risk (CMAR) for a major landslide stabilization project in Jackson, Wyoming.
Project highlights include:
Demolition of existing structures and retaining walls
Construction of shear keys, unloading benches, and earthen buttresses
Installation of Hilfiker retaining wall system
Road, pathway, utility, and parking reconstruction
Multi-year phased construction totaling nearly $8 million
Completed in December 2018, this complex project stabilized a critical corridor within the town.
Ralph Wenz Airport Drainage Improvements (2014)
Westwood Curtis Construction completed additional drainage improvements at Ralph Wenz Field in 2014.
Project highlights include:
Installation of 2,800 feet of 24” drainage pipe
Construction of drainage manholes
Excavation of 4,100 feet of open ditches
Restoration of approximately 8 acres of surface area
This project improved long-term stormwater management at the airport.
Ralph Wenz Airport Drainage Improvements (2010)
Westwood Curtis Construction completed stormwater control upgrades at Ralph Wenz Airport in 2010.
Project highlights include:
Installation of approximately 850 feet of arched culvert
Construction of manholes and diversion structures
Phased construction to maintain airport operations
Completion within a 20-day construction window
Careful scheduling ensured uninterrupted aircraft movement throughout the project.
Flat Creek Emergency Ice Removal
Westwood Curtis Construction has supported emergency ice removal operations for waterways flowing through Jackson, Wyoming.
Project highlights include:
Removal of ice dams during extreme freeze/thaw cycles
Protection of businesses, residences, and roadways
Emergency response during severe winter conditions
Coordination with the Town of Jackson
This work helps prevent flooding and infrastructure damage during high-risk winter conditions.
Army Corps of Engineers Levees
Westwood Curtis Construction was awarded a multi-year contract to reconstruct and repair levees along the Snake River west of Jackson, Wyoming.
Project highlights include:
Removal of woody vegetation from levee surfaces
Reconstruction of levee subgrade
Placement of riprap armoring for core protection
Long-term coordination with federal agencies
This three-year project strengthened critical flood protection infrastructure along the Snake River.
Rustic Inn
Westwood Curtis Construction completed site work and underground utilities for the redevelopment of the Rustic Inn in Jackson, Wyoming.
Project highlights include:
Demolition of the former Wagon Wheel Campground
Installation of water and sewer infrastructure for 64 cabin units
Soil stabilization due to unstable ground conditions
Site work supporting pool, restaurant, and front office construction
Completed in 2008, the Rustic Inn was later recognized as one of the Top 50 Hotels Worldwide in 2013.
Pinedale Water Metering Improvements
Westwood Curtis Construction was contracted by the Town of Pinedale to install water meters throughout the municipality.
Project highlights include:
Installation of over 1,200 water meters
Meter placement in pits, vaults, and building interiors
Installation of automatic meter reading base station and antenna
System-wide upgrades to improve water usage tracking
This project modernized the town’s water infrastructure and improved long-term resource management.
Elk Refuge Irrigation Project
Westwood Curtis Construction completed large-scale irrigation infrastructure installation for the National Elk Refuge.
Project highlights include:
Installation of approximately 39,000 feet of HDPE irrigation pipeline
Pipe sizes ranging from 10” to 42” HDPE
Sidewall fusion of 68 laterals, drains, and vents
Installation of pressure reducing stations and steel pipe manifold
Work completed in extremely rocky terrain using specialized excavation techniques
Certified pipe welders and extended shifts allowed the project to be completed ahead of schedule despite challenging conditions.
Teton Village Commons
Westwood Curtis Construction served as General Contractor for the construction of a central commons area in Teton Village, Wyoming.
Project highlights include:
Removal of existing streams and pond features
Mass grading and site preparation
Construction of sidewalks, amphitheater, and central ice skating rink
Installation of pop-jet fountains, underground control bunkers, and fire pits
Coordination with multiple trades, suppliers, engineers, and architects
Completed in Spring 2010, this project required complex coordination and execution in a highly visible public setting.
GTNP Waste Water Treatment Plant
Beginning in Fall 2016 and completing in Spring 2019, Westwood Curtis Construction completed extensive utility installation in Grand Teton National Park in coordination with construction of a new wastewater treatment facility.
Project highlights include:
Installation of approximately 5 miles of:
12” HDPE water transmission main
8” HDPE water distribution main
8” PVC gravity sewer
4” HDPE pressure sewer
Coordination with construction of a wastewater treatment plant, pump station, and concrete water tank
Work performed in a highly regulated and environmentally sensitive national park
This multi-year project demonstrates Westwood Curtis’s ability to deliver complex utility infrastructure while meeting strict environmental and regulatory requirements.
John Dodge Residence
Westwood Curtis Construction partnered with Kurt Wimburg Construction to complete site and infrastructure work for a custom, multi-million-dollar residence located along the west bank of the Snake River in Jackson Hole, Wyoming.
Project highlights include:
Installation of underground utility systems
Construction of a 3,800-square-foot pond with a central island
Installation of a water recirculation system, including underground piping and stream features
Site grading to support the primary residence and guest house
Coordination within a sensitive river-adjacent environment
This project reflects Westwood Curtis’s ability to support high-end residential construction with complex site features in environmentally sensitive locations.
172 Center Street Commercial
In 2010, Westwood Curtis Construction completed site and civil work for a multi-use commercial building at 172 Center Street in downtown Jackson, Wyoming.
Project highlights include:
Demolition of an existing structure
Construction of new building foundations
Shoring of adjacent roadways and buildings
Mass excavation and storm drain installation
Water and sewer connections
Concrete surface drainage and asphalt paving
This project required careful coordination in a dense downtown setting, with close attention to structural support and adjacent infrastructure.
Hotel Terra Commercial
Westwood Curtis Construction completed large-scale excavation and utility work for Hotel Terra, located at the base of Jackson Hole Mountain Resort in Teton Village, Wyoming.
Project highlights include:
Large-scale excavation and site preparation
Installation of underground utilities
Coordination in a high-traffic resort environment
Construction support for a major hospitality development
Due to its size and prominent location, this project required careful logistics and execution. The completed hotel stands as a landmark development with views of the Grand Tetons.
185 N Glenwood Commercial
Westwood Curtis Construction was contracted by SHAW Construction to complete foundation and underground parking work for a future hotel development in Jackson, Wyoming.
Project highlights include:
Construction of foundations and underground parking
Storm drain installation and imported backfill
Site wall construction and curb & gutter work
Water main connections and sidewalk preparation
Redevelopment of a previously abandoned site
Completed in Fall 2013, this project required careful coordination and site preparation to support future vertical construction in a dense urban environment.
Lake Creek Ranch Residence
Westwood Curtis Construction supported site and civil work for a custom residence at Lake Creek Ranch near Teton Village, Wyoming, located in a remote and environmentally challenging setting.
Project highlights include:
Construction support for a remote residential site
Installation of a basement fully submerged in groundwater
Long-term dewatering operations maintained throughout construction
Site grading and infrastructure coordination
This project required extensive groundwater management and technical expertise. Westwood Curtis’s experience and equipment allowed construction to proceed safely and successfully over several months of dewatering.
Granite Ridge Residence
Westwood Curtis Construction partnered with Bontecou Construction to complete site and civil work for a custom residence near Teton Village, Wyoming.
Project highlights include:
Construction of retaining wall systems
Site grading and extensive rock excavation
Installation of water and sewer services
Coordination within a constrained site with limited access
This project required precise planning and execution due to challenging terrain and access conditions. The completed residence reflects the high standards expected in premium mountain home construction.
Ely Springs Residence
In 2007, Westwood Curtis Construction partnered with Charlie Ankeny Construction to complete site and civil work for a custom residence located south of Jackson, Wyoming.
Project highlights include:
Construction support for a stone and wood custom home
Installation of a custom wooden panel-laminate bridge
Creation of a streambed running beneath the residence
Site work associated with a one-of-a-kind outdoor pool feature
Coordination within a unique architectural and natural setting
This project reflects Westwood Curtis’s ability to support highly customized residential builds through precise site work, infrastructure coordination, and attention to complex design elements.
Butte Residence
Westwood Curtis Construction partnered with Kurt Wimburg Construction to complete site and civil work for a private residence near Jackson, Wyoming, located in a challenging, high-elevation setting.
Project highlights include:
Extensive rock excavation in difficult terrain
Site grading to accommodate steep slopes and limited access
Coordination of construction logistics in a constrained work area
Support of high-end residential construction with elevated quality standards
The project required careful planning and execution due to challenging grades, restricted access, and complex excavation conditions. The completed residence reflects the level of precision and craftsmanship expected in premium residential construction, with expansive views of the Grand Tetons and Sleeping Indian.
Owl Creek Residence
In 2013, Westwood Curtis Construction partnered with Summit Log Homes to complete civil and site work for a custom log home located north of Jackson, Wyoming.
Project highlights include:
Site grading and excavation for residential construction
Pond construction and associated earthwork
Installation of water and septic systems
Driveway construction and access improvements
Extensive tree removal and site preparation
This project demonstrates Westwood Curtis’s ability to support custom residential construction through comprehensive site development, utility installation, and careful coordination in rural and natural settings.