Elk Refuge Irrigation Project
Westwood Curtis Construction completed large-scale irrigation infrastructure installation for the National Elk Refuge.
Project highlights include:
Installation of approximately 39,000 feet of HDPE irrigation pipeline
Pipe sizes ranging from 10” to 42” HDPE
Sidewall fusion of 68 laterals, drains, and vents
Installation of pressure reducing stations and steel pipe manifold
Work completed in extremely rocky terrain using specialized excavation techniques
Certified pipe welders and extended shifts allowed the project to be completed ahead of schedule despite challenging conditions.