MIDDLE CONNECTOR PATHWAY TUNNEL

Westwood Curtis Construction excavated and installed a 101-foot precast concrete tunnel beneath Highway 22 to safely route pathway traffic across one of Wyoming’s busiest transportation corridors. The project was completed during peak tourist season while maintaining two-way traffic throughout construction.

Project highlights include:

  • Excavation and installation of a 101-foot precast concrete pathway tunnel

  • Construction beneath Highway 22, the busiest non-interstate highway in Wyoming

  • Work performed during peak tourist season with continuous two-way traffic maintained

  • Coordination of mass excavation operations in a constrained roadway environment

  • Installation of storm drainage and dry utilities as part of the tunnel infrastructure

  • Careful traffic control and sequencing to minimize congestion and disruption

This project demonstrates Westwood Curtis’s ability to execute complex underground infrastructure work in high-traffic conditions while maintaining safety, access, and schedule integrity.