SNAKE RIVER SPORTING CLUB WATER SYSTEM

Westwood Curtis Construction was awarded the contract to complete critical water and sewer infrastructure for the Snake River Sporting Club in Teton County, Wyoming, following the bankruptcy of the original contractor. The project was funded through surety bond monies and was essential to preparing the development for certificates of occupancy.

Project highlights include:

  • Completion of HDPE pressure sewer and water distribution systems

  • Installation of water distribution infrastructure at the storage tank

  • Construction of a chlorination system to meet operational standards

  • Subsurface stabilization and completion of the water storage tank

  • Repairs to previously installed, deficient HDPE pipeline systems

  • Installation of pressure-reducing stations and dosing siphons

  • Roadway completion associated with underground utility work

  • Identification and repair of water and sewer leaks prior to substantial completion

This project required detailed investigation, corrective construction, and coordination to address existing system deficiencies and deliver a reliable utility infrastructure under tight regulatory requirements.