FISH CREEK BRIDGE
Westwood Curtis Construction constructed a private bridge over Fish Creek in Wilson, Wyoming during the winter of 2019–2020. The project involved replacement of an existing wooden bridge with a new 82-foot steel bridge, requiring careful planning and execution in winter conditions and a sensitive environmental setting.
Project highlights include:
Demolition and removal of the existing wooden bridge
Construction of a new 82-foot steel bridge structure
Installation of cast-in-place concrete abutments and piers
Integration of steel H-piles driven into the creek
Winter construction completed prior to fish spawning season
Continuous dewatering and stream diversion maintained for nearly four months
This project reflects Westwood Curtis’s ability to execute complex bridge construction in challenging conditions while meeting environmental requirements and maintaining project timelines.
Flat Creek Pedestrian Bridge Widening
Westwood Curtis Construction completed the widening of a pedestrian bridge crossing Flat Creek in Jackson, Wyoming in 2008.
Project highlights include:
Placement of precast concrete deck sections
Construction of concrete wingwalls
Cast-in-place concrete bridge deck installation
Site grading and approach work
Construction performed adjacent to active traffic and overhead power lines
This project reflects Westwood Curtis’s experience executing infrastructure improvements in constrained, high-traffic environments while maintaining safety and coordination.
GRAND TETON NATIONAL PARK BRIDGE
Westwood Curtis Construction completed the installation of a 60-foot prefabricated steel bridge for Grand Teton National Park in 2011.
Project highlights include:
Coordination with the Federal Highway Administration (FHWA) and National Park Service
Accelerated construction schedule requiring close agency collaboration
Installation of concrete bridge abutments with dewatering and shoring adjacent to Highway 89
Full bridge installation completed in under three months
This project demonstrates Westwood Curtis’s ability to deliver bridge infrastructure in sensitive, high-visibility environments while maintaining safety, precision, and schedule control.
Taylor Ranch Bridge
Westwood Curtis Construction completed construction of a steel deck bridge over the Gros Ventre River in Jackson Hole, Wyoming in 2009 for the U.S. National Forest Service.
Project highlights include:
Selection based on both bid price and demonstrated experience
Salvage and removal of the existing bridge structure
Construction of new concrete bridge abutments
Installation of steel bridge decking, guardrails, and bridge approaches
Coordination with the Forest Service Contracting Officer and nearby landowners
Project delivered on schedule
This project reflects Westwood Curtis’s experience delivering bridge construction projects that require coordination with federal agencies, landowners, and complex site conditions.
Lima Rural Bridge Replacement
Westwood Curtis Construction completed the removal and replacement of an existing rural bridge near Lima, Montana in 2009, delivering a new precast concrete bridge under a highly compressed timeline.
Project highlights include:
Removal of the existing rural bridge structure
Installation of a new precast concrete bridge
Completion of full bridge replacement in under three weeks
Work executed under time constraints due to rising stream water levels
Coordination with Beaverhead County and the Town of Lima
This project demonstrates Westwood Curtis’s ability to deliver critical bridge infrastructure efficiently while coordinating closely with local agencies and managing challenging site conditions.
Governor Creek Tri-Deck Bridge
Jackson, Montana
Westwood Curtis Construction completed a concrete tri-deck bridge installation over Governor Creek near Jackson, Montana in 2009.
Project highlights include:
Removal of existing culvert sections
Pile driving of 12-inch steel H-piles
Construction of concrete grade beams, bridge decking, and railing
Raising the existing roadway approximately five feet in elevation
Coordination with Beaverhead County and Montana Fish, Wildlife & Parks
This project reflects Westwood Curtis’s experience delivering bridge and infrastructure construction projects that require coordination with public agencies, technical execution, and long-term durability.