Pine Glades / Cache Street Improvements
Westwood Curtis Construction was contracted by the Town of Jackson in 2010 to improve utilities and roadway alignment along South Cache Street in support of the newly constructed Cache Tunnel beneath Snow King Resort.
Project highlights include:
Roadway realignment to improve safety and visual continuity near the tunnel entrance
Replacement of water main and storm sewer infrastructure
Installation of new asphalt roadway, curb and gutter, sidewalks, and brick pavers
Signage, guardrail installation, and site revegetation
This project required careful coordination within an active urban corridor while supporting long-term infrastructure improvements tied to a major tunnel project.
