Pine Glades / Cache Street Improvements

Westwood Curtis Construction was contracted by the Town of Jackson in 2010 to improve utilities and roadway alignment along South Cache Street in support of the newly constructed Cache Tunnel beneath Snow King Resort.

Project highlights include:

  • Roadway realignment to improve safety and visual continuity near the tunnel entrance

  • Replacement of water main and storm sewer infrastructure

  • Installation of new asphalt roadway, curb and gutter, sidewalks, and brick pavers

  • Signage, guardrail installation, and site revegetation

This project required careful coordination within an active urban corridor while supporting long-term infrastructure improvements tied to a major tunnel project.

Previous
Previous

Phase 2 N 89 Pathway

Next
Next

Apres Vous Road