Phase 2 N 89 Pathway
In 2011, Westwood Curtis Construction constructed a 7,500-foot paved pathway for Teton County within Grand Teton National Park and adjacent to the National Elk Refuge.
Project highlights include:
Installation of culverts ranging from 18” to 42” in diameter
Use of geogrid reinforcing mat, excavation, grading, and crushed gravel
Placement of asphalt pavement, signage, and guardrail
Construction of a 75-foot tunnel beneath Highway 89
Day and night construction shifts to minimize traffic impacts and reduce time within the public right-of-way
This project required precise coordination within a high-traffic corridor and sensitive environmental setting while maintaining access and safety throughout construction.