Phase 2 N 89 Pathway

In 2011, Westwood Curtis Construction constructed a 7,500-foot paved pathway for Teton County within Grand Teton National Park and adjacent to the National Elk Refuge.

Project highlights include:

  • Installation of culverts ranging from 18” to 42” in diameter

  • Use of geogrid reinforcing mat, excavation, grading, and crushed gravel

  • Placement of asphalt pavement, signage, and guardrail

  • Construction of a 75-foot tunnel beneath Highway 89

  • Day and night construction shifts to minimize traffic impacts and reduce time within the public right-of-way

This project required precise coordination within a high-traffic corridor and sensitive environmental setting while maintaining access and safety throughout construction.