Town of Jackson Water Main Replacement
Westwood Curtis Construction completed a waterline replacement project within the Town of Jackson, Wyoming, focused on improving utility infrastructure while maximizing efficiency and cost savings.
Project highlights include:
Installation of approximately 4,580 linear feet of ductile iron water main
Installation of water main fittings, including 4”, 6”, 8”, and 12” gate valves and bends
Removal of approximately 6,100 square yards of existing asphalt roadway
On-site asphalt grinding and reuse of pulverized asphalt as road base material
Placement of approximately 1,150 tons of new asphalt pavement
Construction of new sidewalks and final surface restoration
By recycling existing asphalt on-site, Westwood Curtis significantly reduced material costs and eliminated asphalt disposal, delivering the project ahead of schedule while maintaining roadway quality and performance.